TGP

白芍总苷
常用释义
abbr. 三峡工程(Three Gorges Project);白芍总苷(total glycosides of paeony)

扩展信息

白芍总苷(total glucosides of paeony)
...分的混合物,总称白芍总苷。白芍总苷胶囊主要成分是白芍总苷(TGP),是一种解热镇痛及非甾体抗炎镇痛药,为胶囊剂,内容 …
白芍总甙
白芍总甙tgp)对大鼠佐剂性关节炎(aa)有抗炎和机能依赖性免疫调节作用,50mg/kg灌胃,每日1次,连续11日,对aa明 …
帕夫林
3 讨论 帕夫林(TGP)是我国新开发的抗炎免疫调节 药。为中药白芍制剂,其主要成分为白芍总甙。
简略的画廊(thumbnail gallery post)
Non Nude Thumbnail Gallery Post (TGP), Links, Teen pics and more. clip cum free porn shot Just killer anal sex the way it ...
白芍总苷胶囊
白芍总苷胶囊TGP)--天然 安全, 天然, 白芍总苷胶囊(帕夫林 TGP)--天然,安全,保肝 成分: 成分:主要为芍药苷、 …

例句

The paper has analyzed the dynamometer monitoring result of high slope anchor cable of TGP double-line five-grade ship lock.

本文对三峡工程双线五级船闸高边坡锚索测力计监测资料进行了分析。

The flood control benefit of the TGP is the greatest contribution to the improvement of the eco-environment in the middle and lower reaches.

三峡工程的防洪效益是它对长江中下游生态环境得以改善的最大贡献。

This paper researches the reasons of TGP s banquette slumping during river closure by the Catastrophe theory and Self organized criticality.

从突变理论及自组织临界性理论,对三峡大江截流戗堤坍塌机理进行研究。

The TGP is scheduled to expire at the end of this year, leaving solar projects high and dry.

TGP预计今年年底就到期了,届时太阳能发电项目将再次陷入无助的困境。

目的观察白芍总甙(TGP)联合甲氨蝶呤(MTX)治疗类风湿关节炎(RA)的疗效。

With water extraction and gel filtration purification, a kind of polysaccharide protein conjugate, TGP(Tea Glycoprotein), was prepared.

用水提取茶叶并采用凝胶纯化,从茶叶中分离得到一种多糖蛋白复合物TGP。

三峡工程从构想、论证、设计、建设至竣工全面投入运行历时近百年。

采用饱和渗流模型,对降雨入渗条件下三峡船闸边坡渗流场的非稳态变化情况进行了分析。

We observed the sheet-like processes typical morphology of DCs stimulated by TGP.

树突状细胞经TGP诱导刺激后的树突状细胞形态越发典型;

By using the sonic wave and the seismic wave, the foundation rock holding layer on-spot testing of TGP has been performed.

应用声波及地震波对三峡工程坝基建基岩体持力层进行现场检测。

It is proved that one year ahead of the original schedule for the third-stage engineering construction of TGP is feasible.

最后结果表明,三峡三期工程施工提前一年是可行的。

三峡工程基础灌浆高压下湿磨细水泥浆材的性能研究

Selection and Verification of the Structural Pattern of the Penstock and Spiral Case of the TGP Power-station

三峡工程水电站压力管道和蜗壳技术结构型式的选择及论证

三峡导流明渠施工通航原型观测与模型验证

Hydraulic calculation for TGP second stage cofferdam construction during flood period and its actual verification

三峡工程二期围堰截流度汛期的水力学计算

Analysis on river bed evolution of dam area from the main river closure to open diversion channel closure of TGP

三峡工程大江及明渠截流期间坝区河演分析

三峡电站蜗壳敷设软垫层浇筑外围混凝土研究

三峡电源电站主厂房蜗壳混凝土施工技术

三峡升船机上游浮式导航堤长度优化研究

Reversion analysis of anti-shearing strength parameters of a landslide in TGP reservoir area

三峡库区某滑坡抗剪强度参数的反演分析

三峡水库蓄水对长江进入河口流量时间的影响

Seepage prevention wall constructed with high pressure jetting for stage I separation levee and its cofferdam at TGP

三峡船闸下游隔流堤及施工围堰高喷防渗施工

三峡水库蓄水前后下泄水温变化及其影响研究

Threat on Bank of Hanjiang River due to the Impounding Water of TGP and Its Countermeasures

三峡水库蓄水对汉江堤防安全的威胁及防御对策

The research of the navigation and diversion in TGP channel and its numerical simulation

三峡工程明渠导流通航及数值实验研究概述

三峡上游隔流堤高强度填筑施工设备配置

10 Years of supervision on TGP construction of the Yangtze river

长江三峡工程建设监理的10年实践

三峡水库区间定量降水预报不确定性初探

三峡工程建设的重大决策--党的三代领导人关怀三峡工程建设的回顾

三峡工程升船机施工期基础变形监测初步分析