根据设计,第一阶段开钻所需各种符合技术要求的处理剂应一次到位。
钻井队在开钻前应根据钻井设计书的要求,制定出该井的施工技术措施。
1·The two-stage cementing technique was used for the protective casing of the horizonal well in Tahe oil field because of a long open-hole interval in secondary spudding.
塔河油田水平井由于第二次开钻裸眼段长,技术套管采用双级固井技术。
2·The HSE officer began to fill in the Spudding Record.
HSE 官员开始在桌上填写他的开钻记录。