1·Chinese tendering process for steam turbines and turbo generator.
了解中国汽轮发电机组市场投标过程。
2·This paper presents a new parallel relative diagnosis model (PRDM) for turbo generator sets.
提出了一种新的汽轮发电机组故障诊断模型-并行关联诊断模型(PRDM)。
3·This paper describes the function of exhaust gas turbo generator simulation system and its main design idea.
简要介绍了废气透平发电机仿真系统的功能和研制的指导思想。
4·The dynamic properties of bearing support system has large influence on the vibration of large turbo generator unit.
汽轮发电机组轴承座动力特性对转子-轴承系统振动有比较大的影响。
5·The turbo generator controller be based on the theory of variable structure control and the theory of fuzzy control.
以模糊变结构控制理论为基础,把汽门控制、制动电阻控制及附加励磁控制很好地协调起来。
6·Bearing dynamics of the running unit can be analyzed also. The method can be easily applied to turbo generator units.
该方法在现场很容易实现,可以对运行机组进行实测,具有非常强的实用性。
7·The paper a applied method, which can determine the position of rotor rum short-circuit point for large turbo generator easily and reliably.
介绍了一种确定大型汽轮发电机转子匝间短路点位置的方法,该方法简单快捷、实用可靠。
8·The 300MW turbo generator was built in DFEM in 1985. It is the first 300MW turbo generator with water coolest stator winding and hydrogen cooled rotor in China.
东方电机厂在1985年试制成功300MW汽轮发电机,这是国内首台水-氢-氢型300MW汽轮发电机。
9·Out of Phase Shunting of large turbo generator sets is an often met with fault in power systems, which constitutes a vital factor effecting safe operation of the set.
非同期并列是大型汽轮发电机组常见的电力系统故障之一,对机组的安全运行甚为关键。
10·A turbo generator coordinated controller is designed by control law with self adjusting factor based on the theory of variable structure control and the fuzzy control.
以变结构控制理论为基础,利用模糊控制理论设计了带自调整因子的控制规律,用于设计汽轮发电机组的综合控制器。