1·The volumetric heat transfer capacity of plate cooler is 1.5 times as that of fin-tube cooler and 15 times as that of tube cooler.
板式空冷器单位体积换热量约是翅片管式空冷器的1.5倍,是光管式的15倍;
2·A ferroalloy electric furnace smoke remaining heat recycling hot tube cooler, is comprised of inner cylinder, outer cylinder and hot tube.
一种铁合金电炉烟气余热回收用热管降温器,由内筒体、外筒体 和热管组成;
3·Regenerator is one of the key components of pulse tube cooler, and its efficiency can greatly influence the performance of pulse tube cooler.
回热器是脉管制冷机的关键部件之一,其效率对脉管制冷机性能有很大影响。
4·A lowest no-load temperature of 13.8 K has been obtained for the first stage without thermal connector, which is a new record for the single-stage pulse tube cooler.
在没有热桥连接的情况下,单独测试第一级最低制冷温度达到13.8 K,这是单级脉管制冷机获得的最低制冷温度新纪录。
5·Use single stage version to reach the temperature of 20 K is a difficulty for high frequency pulse tube cooler (PTC). Multi-stage version is a popular method to reach the low temperature.
单级高频脉冲管制冷机直接降低到20 K以下温区存在很大困难,采用多级方案是高频脉冲管制冷机获得更低温度的主要方法。
6·It establishes the basis for the design, optimization and application of tube type indirect evaporative cooler.
为管式间接蒸发冷却器的设计、优化和推广应用奠定了基础。
7·Established the cooler fin tube production Division in the Utsunomiya Plant for expansion of production.
建立了较凉的翅片管的生产部门,在宇都宫厂为扩大生产。
8·Aimed at the leaking and tube blasting of melt salt cooler, analyzes various reasons for the corrosion, and presents relative countermeasures, obtaining good results.
针对熔盐冷却器发生泄漏及产生爆管的现象,分析可导致腐蚀的各种原因,并提出了相应的对策措施,取得了良好效果。
9·The bimetallic rolled finned tube high pressure air cooler is applied in first time on diesel hydrogenated unit of Jinan refinery.
双金属轧制翅片管高压空冷器首次用于济南炼油厂柴油加氢装置。
10·After presenting the initial design of a heat pipe oil cooler which is used to renew the shell-and-tube oil cooler the paper describes its reasonableness and economy.
并且就电厂换热设备之一的管壳式冷油器更新为热管式冷油器的初步设计论述了其合理性和经济性。