1·The experiment results show that the time of the maximum power PTO shaft test and the maximum power traction test can be decreased from two hours to one hour.
试验结果表明,两小时最大功率动力输出轴试验和两小时最大功率牵引试验均可减少为1小时。
2·Objective To compare the effects of simple eye movement training and eye movement training combined with traction test on the vision after orbital blowout fracture.
目的分析单纯眼球运动训练和眼球运动训练辅助被动牵拉训练在眼眶爆裂性骨折术后患者眼肌力训练中的应用及对患者视功能的改善作用。
3·Objective To investigate the applying effects of simple eye movement training and eye movement training combined with traction test on vision recovery after orbital blowout fracture.
目的分析单纯眼球运动训练和眼球运动训练辅助被动牵拉训练在眼眶爆裂性骨折术后患者眼肌力训练中的应用及对患者视功能的改善作用。
4·A reciprocal power-fed test platform of metro traction which is based on vector control with deviation decouple was presented.
提出了一种基于偏差解耦矢量控制的能量回馈型地铁牵引试验台的设计方案。
5·Based on the test data of Suizhongbei electric traction substation, this paper analyzes the harmonic voltage problem.
本文根据测试数据对绥中北牵引变电所谐波电压问题进行分析。
6·This paper introduces the test and speed regulating control for the traction experimental system of urban railway vehicle.
介绍了城市轨道车辆牵引试验系统的测试与调速控制。
7·For insulation test on traction power supply equipment in electrified railway, a new type of synthetic measuring instrument is developed.
针对电气化铁道牵引供电设备的绝缘试验,研制了一种新型便携式绝缘综合测试仪。
8·The uniform current test of the rectifier for traction power is the test subject that aimed at inspecting the current distribution of the rectifying elements in every parallel branch line bridge.
牵引整流柜均流试验正是为了检测其各个桥臂并联支路整流元件的电流分配情况而设立的检验项目。
9·Development and test of IGBT traction inverter for metro vehicle are introduced. Structure and main parts of the inverter are briefed. Main parameters are given.
介绍了IGBT地铁牵引逆变器的研制及试验情况,对该逆变器的结构及主要部件作了简要说明,给出了逆变器的主要参数。
10·Introduced in this paper are the concrete methods and notices of traction motor temperature-rise test, which includes continuous temperature-rise test and hour temperature-rise test.
牵引电机温升试验包括持续温升试验及小时温升试验两种,文章介绍了其具体实施方法和技巧,以及实验时应注意的事项。