1·The steam generators are inside the containment.
蒸汽发生器是在容器里面的。
2·You'll see steam generators which are listed here.
你们会看到蒸汽发生器,列在这。
3·For use with one control generator steam generators.
3个蒸汽炉可使用一个控制板。
4·The replacement of steam generators requires 35 to 60 days in general.
蒸汽发生器的更换过程一般需要35-60天左右。
5·The invention applies, in particular, to steam generators of pressurized water nuclear reactors.
本发明特别应用于高压水核反应器的蒸汽发生器中。
6·Steam generators used in CANDU plants around the world have demonstrated high reliability for many years.
国际核电站的运行经验表明,坎杜堆蒸汽发生器具有较高的可靠性。
7·This model can be used to analyze thermal-hydraulic transient behaviour of inverted U-tube steam generators in PWR power plants.
该模型可用于分析压水堆核电厂U型管自然循环式蒸汽发生器的热工水力瞬态过程。
8·This paper presents an one-dimensional homogeneous flow model for thermal-hydraulic transient behaviour of PWR steam generators.
本文介绍了压水堆核电厂蒸汽发生器的一维均相流瞬态分析模型。
9·Strong mineral acids can cause damage when cleaning deposits in industrial equipment such as boilers, steam generators and heat exchangers.
用强无机酸清洗工业产品如锅、蒸汽锅炉和热交换器时会损坏设备。
10·This paper presents the test results of cold and hot state for concentric ver-tical shutter steam separator used in vertical natural circulation steam generators.
本文介绍了用于立式自然循环蒸汽发生器的同心立式波形板汽水分离器的冷、热态试验结果。