1·Fatigue strength of BINGO9000 semisubmersible drilling rig is analyzed in this paper.
本文对BINGO 9000半潜式钻井平台进行了疲劳强度分析。
2·The cellar deck is the lower deck on a semisubmersible drilling platform with two decks.
在具有两层甲板的半潜式钻井平台上,它是下甲板。
3·The first semisubmersible drilling RIGS that it built are now operating in Norway and Brazil.
该公司建造的首批半潜式钻井平台已在挪威和巴西开始运作。