1·The Concrete facing is a main imperious structure of rockfill dam.
混凝土面板是堆石坝的主要防渗体。
2·Shuibuya dam is currently the highest concrete face rockfill dam in the world.
水布垭面板堆石坝是目前世界上最高的面板堆石坝。
3·The maximum dry density is a mainly index of compaction quality for rockfill material.
最大干密度是确定填石料压实质量的一个主要指标。
4·The stress-strain behaviour of rockfill is seriously influenced by the particle breakage.
颗粒破碎对堆石体的应力应变特性具有十分重要的影响。
5·The major dam of Nierji water project is an earth- rockfill dam with asphalt concrete core.
尼尔基工程主坝为沥青混凝土心墙土石坝,主坝工程施工采用两期导流方式。
6·A new in-situ direct shear testing method for large-grained rockfill materials is introduced.
介绍了一种适用于大颗粒堆石材料的新型现场直剪试验法。
7·The article introduces several development of concrete face rockfill dam construction in recent years.
文章主要介绍近年来混凝土面板堆石坝建设的若干新进展。
8·For the concrete faced rockfill dam, the deformation control is the key to the design and construction.
对面板堆石坝而言,坝体变形控制是设计和施工的首要问题。
9·The plinth is an important part for a concrete faced rockfill dam. Its major role is to prevent seepage.
趾板是混凝土面板堆石坝的重要组成部分,其主要作用是防渗。
10·The plinth is an important part for a concrete faced rockfill darn. Its major role is to prevent seepage.
摘要趾板是混凝土面板堆石坝的重要组成部分,其主要作用是防渗。