1·It can also take care of some plate girder defections, such as residual stresses and initial bending.
它还可以考虑梁的初始缺陷,如残余应力和初弯曲。
2·Fabricating and demoulding of the base mould is a key during the course of construction for precast plate girder of highway bridge.
公路桥梁预制钢筋混凝土板梁施工中,底模的制作及脱模是关键。
3·When a welded I-section plate girder is subjected to bending or shearing, buckling of web in elastic range will be restrained by flanges.
在纯弯或纯剪分别作用下的工字形焊接板梁,在弹性范围内腹板屈曲时,翼缘会对腹板起约束作用。
4·In the paper, one of the finite element analytical models for spatial vibration of the train and deck steel plate girder bridge system is presented.
以结构力学为基础,利用加固前对钢板梁桥测得的横向位移,提出了一种通过反算出列车等效横向摇摆力来计算加固后钢板梁桥的横向位移的方法。
5·To analyse the demand of transverse rigidity and the strengthening scheme of deck plate girder according to the raising speed experiment of the existing track.
通过既有线铁路提速试验,分析了上承钢板梁横向刚度的要求,提出合理的加固方案。
6·So the dynamic response of the plate girder bridge under moving loads are the problem which is concerned about all along, and also a project to be studied deeply.
同时,简支板梁桥又是小跨径桥梁最常用的桥型之一,因此,移动车辆荷载引起的简支板梁桥动力效应越来越被工程技术界所关注。
7·The handworked calculational way of coping elevation for free plate girder curve bridge in expressway have more repeated workload, slow footed and easy to make a mistake.
高速公路曲线简支板桥盖梁标高的手工计算方法,重复性工作量大、速度慢、易出错。
8·This paper introduce the calculational program of coping elevation for free plate girder curve bridge and resolve the handworked calculational defect, it will useful for improving work efficiency.
文章通过对曲线简支板桥盖梁标高计算程序的介绍,解决了手工计算的缺点,对于提高工作效率起到了一定的作用。
9·A kind of finite segment element model for analysis of shear lag effect in plate and truss composite girder is proposed. The model avoids certain deficiencies in conventional calculations.
提出一种板桁结合梁剪滞效应分析的有限段单元模型,避免了常规计算方法中的某些不足。
10·The vierendeel sandwich plate is composed of cross vierendeel girder.
空腹夹层板由空腹梁交叉组成。