monte Carlo analysis

蒙特卡罗分析
常用释义
蒙特卡罗分析

例句

1·This paper introduced worst case analysis and monte carlo analysis with software of EWB.

举例说明用ewb进行最坏情况分析和蒙托卡诺分析的具体方法和步骤。

2·Monte Carlo analysis is used in device analysis and circuit design to evaluate the mismatch effect.

蒙特卡罗分析被应用于器件分析和电路设计,评估器件失配对电路性能的影响。

3·Accompanying this have been new approaches to data analysis using, for example, Markov Chain Monte Carlo simulations that are hugely computer intensive.

伴随着这个,又有了使用的数据分析新方法,例如,马尔科夫链,蒙特卡洛模拟这些大型计算机密集型算法。

4·Now let's discuss Sensitivity Analysis and Monte Carlo Simulation.

现在让我们开始讨论敏感性分析和蒙特卡洛模拟。

5·A software reliability testing method, judge standard and test process based on random testing model is introduced in the paper, and Monte Carlo method is used result analysis.

本文提出一种基于随机测试模型的软件可靠性测试方法、评判准则和测试策略,并利用蒙特卡罗方法进行了分析。

6·At last, some methods of uncertainty analysis are listed, such as Monte Carlo method, Taylor method, probability trees and expert judgement method.

最后列举了不确定性分析的方法,即蒙特卡罗法、泰勒简化法、概率树法和专家判断法。

7·Dynamic analysis using the Monte Carlo method in the main.

在动力分析中主要采用蒙特卡洛方法。

8·A feasibility study on Zhengzhou Matougang Sewage Treatment Works project is adopting computer programme to make Monte Carlo simulation analysis on the item financial risk.

郑州马头岗污水处理厂工程可行性研究采用计算机程序,对项目财务风险进行蒙特卡洛模拟分析。

9·Research the application of Monte Carlo method for tolerance design, display the calculate formula of estimated stack-up yield and the analysis method of sensitivity to tolerance.

研究了蒙特卡洛法在公差优化中的应用,给出了装配成功率的计算公式以及精度灵敏性分析的方法。

10·Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.

运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。