1·Design make and test ADSL main transformer.
最后设计、制作和测试了通讯adsl变压器。
2·Construction drawing of "Main transformer installation".
《主变压器安装》施工图纸。
3·The main transformer has been operated well since it was put into use in 2000.
主变压器自2000年投产以来,工作状况良好。
4·The omnibus bar of each set is connected with main transformer through its omnibus bar cave.
每台机组母线通过各自的母线洞与主变压器连接。
5·The cause of the DC bias of the main transformer in the full bridge inverter has been analyzed.
分析了全桥逆变器功率变压器产生直流偏磁的机理;
6·High Quality Double Dipped Impregnated Main Transformer - Provides long life in harsh welding conditions.
高质量的两次浸漆变压器——在恶劣焊接环境中保证较长的使用寿命。
7·Elaborate main transformer and reactor plus steady wire feed circuit, ensure advanced welding performance.
精心设计主变压器和电抗器加平稳的送丝电路,使焊接性能达到同类焊机极限。
8·The composition of the main water-spraying extinguishing system for the main transformer was simply introduced.
介绍了主变压器的水喷雾灭火控制系统的组成。
9·The main transformer USES imported quality cool-rolled silicon-steel plate cores less power loss and small idle current.
主变压器采用进口优质冷扎硅钢片铁芯,其功耗少,空载电流小。
10·Its main transformer is made of imported cold rolled silicon steel, So its power loss is little with low no-load current.
该系列点焊机,主变压器均为进口冷轨硅钢片,因此,主变压器功耗小,各型空载电流小。