1·Tube joint is an important part of immersed tube tunnel.
管段接头是沉管隧道的重要环节。
2·A surveying method of real time monitoring for immersed tube was introduced.
介绍了在沉管隧道施工中,实时监测沉管沉放的一种测量方法。
3·At the same time, the construction method is presented of the final joint in Changhong immersed tube tunnel.
同时,介绍了常洪沉管隧道最终接头的施工方法。
4·This thesis focuses on the theory and the method, and studies all measurements required in the project of immersed tube tunnel.
本文重点在理论上和方法上对沉管隧道施工所需的各项测量工作进行了研究。
5·Describes an instrument for measuring the local flow characteristics around a immersed tube in a high temperature fluidized bed.
介绍了一种测量高温流化床水平埋管流动特性的测量装置。
6·The utility model relates to tunnel class, particularly a piling base structure applied to the construction of immersed tube tunnels.
本实用新型涉及隧道类,特别涉及一种应用在沉管隧道工程中的桩基础结构。
7·Therefore, a study on Immersed tube tunnel underwater slope of reasonable foundation trench slope of the rate has very great significance.
因此,沉管隧道水下基槽边坡合理坡率问题的研究具有很重要的意义。
8·This paper introduces the principle and technique of river way immersed tube construction, and compare with traditional river way cofferdam construction.
介绍了河道沉管法施工原理和工艺,并与传统的河道围堰施工作了一定的比较。
9·Immersed tube tunnels are often analyzed by using the method of beam or plate on elastic foundation which can not precisely simulate the behavior of joints.
沉管隧道纵断面结构计算常采用弹性地基梁或弹性地基板法,但这些方法较难真实模拟沉管隧道的受力情况,特别是接头的受力情况。
10·It may be seemed that the heat transfer model presented in this paper would reflect the heat transfer process of the immersed tube in the fluidized bed combustion boiler.
说明本文所介绍的传热模型在一定程度上反映了沸腾燃烧锅炉内埋管传热过程。