1·The slip method for transporting the precast box beams of Donghai Bridge is adopted in Shanghai municipal deep water harbour engineering.
上海市深水港工程东海大桥,上部结构预制箱梁在预制场内采用滑移方式运输。
2·Guangzhou Harbour Engineering Design Institutee is an affiliate of CHEC Guangzhou Port Construction Company under China Harbour Engineering (Group) Company.
广州港湾工程设计院,直属中国中国港湾建设(团)公司第四航务工程局。
3·Evaluation, design, construction, field observation, supervision in soft ground engineering, harbour engineering, foundation engineering, and highway engineering, etc.
土木水利工程中软基加固、港口码头、地基基础及道路等工程的评估、设计、施工及安全监测、工程监理的咨询。
4·The application of the data real time processing system in harbour engineering model tests is mentioned in this paper. A DJS-19 digital computer is used in this system.
本文叙述了用DJS - 19型数字计算机组成的数据处理系统及其在港工模型试验中进行实时处理的应用。
5·The Third Harbour Engineering Investigation and Design Institute of China Communication (THEIDI) is a large state-owned design enterprise in the field of water transportation engineering.
中交三航设计院(全称中交第三航务工程勘察设计院)是一家主要从事水运工程设计的大型国有设计院。
6·At last, combining with practical subsea tunnel engineering, the minimum rock cover of the Ningbo Xiangshan Harbour subsea tunnel by the above methods is analyzed.
最后结合工程实例,应用上述方法,得到了宁波象山港海底隧道最小岩石覆盖厚度。
7·The reliable engineering tidal levels of Sheyang harbour are calculated.
以此推算出射阳港工程潮位。