1·Coke drum is the key equipment of the delayed coking device.
焦炭塔是延迟焦化装置的关键设备。
2·Coke Tower is one of the important equipment for the delayed coking device.
焦炭塔是延迟焦化装置的重要设备之一。
3·This paper introduces the process, pollution and disposing of the delayed coking unit.
介绍延迟焦化装置的工艺流程、装置的污染和排污基本情况。
4·So the design and study of delayed coking engineering is a practical significance task.
因此,对延迟焦化工程的设计和实施研究是一个具有现实意义的课题。
5·The invention also provides a delayed coking method using the delayed coking equipment.
本发明还提供了使用上述延迟焦化设备的延迟焦化方法。
6·The research progress in shot coke formation and inhibition in delayed coking were summarized.
综述了延迟焦化工艺中弹丸焦生成与抑制的研究进展。
7·Coking furnace performance is critical to the safety and long period running of delayed coking unit.
延迟焦化加热炉是延迟焦化装置安全、长周期运行的关键设备。
8·The inferior vacuum residue produced with Middle East crude oil can be used as raw material of delayed coking and asphalt.
由中东原油生产的劣质减压渣油,可作为延迟焦化原料,也是生产沥青的好原料。
9·The coking problem of heavy oil in tube heating furnace is studied to obtain more ideal operating parameter fro delayed coking.
探讨了重质油在管式加热炉里结焦的问题,得到了比较理想的延迟焦化操作参数。
10·The application situation of new type suspender shape thermal insulation technology on coke drum in delayed coking unit was recommended.
介绍了新型背带式保温技术在延迟焦化装置焦炭塔上的应用情况。