1·Some questions should be highly heeded during construction of the Cut off Wall.
进而提出在地下防渗墙(连续墙)施工中应注意的几个问题。
2·This paper introduces the treatment for deep dam foundation of the concrete cut off wall, which intensity and elastic modulus value are requirement to satisfy the stress, strain and durability.
本文介绍了砼防渗墙对土石坝深厚覆盖层地基的处理,强调防渗墙砼强度及弹模取值应在满足应力应变的前提下,兼顾耐久性等要求。
3·It has the functions of spinning and cutting, especial ly available to cut off big thin-wall cylindrical workpiece such as the shell of compressor.
该机床具有旋压切断功能,特别适用于压缩机壳体等大型圆柱薄壁筒形件的切断加工。
4·Cut off a part of the wall which dyed by the dog's urine, and preserve it as treasure.
把狗狗经常撒尿而变色的墙壁切割并当做重要物品保护起来。
5·Off this section through a hole cut in the lattice is a drier 6-foot by 9-foot area surrounded by a 3-foot high brick wall.
离开这个区域,经由格子窗上的一处开口,可到达一处6英尺宽,9英尺长,较为干燥的地方,其四周围绕著3英尺高的砖墙。
6·Not to think you I in what the season, but when we walked across the complexity of the world, we increasingly by countless invisible wall cut off.
不去想你我处在什么季节,但当我们走过纷繁的世界,我们越来越多地被无数无形的墙阻隔。
7·Pile and cut-off wall are widely used in geotechnical engineering. This kind of structures is in the form of strip or slab.
桩基和堤坝的防渗墙在岩土工程中应用非常广泛,这类结构物具有条状或板状形式。
8·Therefore, it is very necessary and practical to study the mechanism of dike foundation piping and the effect of suspended cut-off wall.
因此研究管涌机理,并在此基础上研究悬挂式防渗墙对双层堤基管涌的控制效果,具有重要的现实意义。
9·The traditional impermeable hardening retaining wall cut off the exchange of material, energy and information between rivers and coasts, and hinder the mutual supply between river and groundwater.
传统的不透水性硬化挡墙切断了河道与岸边之间的物质、能量及信息的交换,阻碍了河道水体与地下水体的相互补给。
10·Suspended cut-off wall can effectively increase foundation resistance to piping and it is more efficient when it is situated in land side than in river side.
悬挂式防渗墙能显著提高堤基抵抗管涌破坏的能力,且防渗墙布置在堤防下游侧比上游侧更有效。