1·The Target and Neiman hacks have also changed the cost calculation: Although retailers have been reluctant to spend the $6.
Target 和 Neiman 的黑客攻击也改变了成本计算:尽管零售商不愿意花那6美元。
2·Cost calculation and analysis.
成本的计算和分析。
3·Assisting standard cost calculation.
标准成本的制定。
4·First is the logistics cost calculation.
首先是物流成本的核算。
5·Knowledge in manufacturing processes, product cost calculation.
了解生产过程,产品核算,项目核算知识。
6·Cost calculation for each project, compare the actual cost with project target cost.
核算项目成本,并比较实际成本与项目目标成本的差异。
7·Technology and market are the two supports of the construction cost calculation and control.
技术与市场是建设成本确定与控制的双支柱。
8·But now the study of educational cost calculation of institutions of high education is just beginning.
但目前对于高校教育成本核算的研究还处于起步阶段。
9·The advantage of ABC lies not only in the accuracy of cost calculation, but in advanced Activity-Based Management.
对于作业成本管理的的实施通过成本计划、成本控制、成本核算和成本分析及考核等方面进行了讨论。
10·Currently, traditional cost calculation and management approaches are still employed in most construction enterprises.
目前,我国大部分的建筑施工企业仍在使用传统的成本计算和管理方法。