1·August 28, with the Coal Bin, chief engineer at the regular meeting hosted technical work.
8月28日,同煤集团总工程师于斌主持召开技术工作例会。
2·In the paper, the part-presser horizontal mechanical coal bin and analysis method of its vertical presser are introduced.
本文提出一种结构简单的分压式水平机械煤仓,并给出其有关参数的计算方法。
3·Section coal bin is transportation link swallow and throat. It plays an important role in the course of coal transportation.
溜煤眼是运输环节的咽喉,在煤炭运输过程中发挥着重要作用。
4·Based on a method of a assistance photosource, a basic method of coal level detection on the mine shaft coal bin is put foruard.
基于一种辅助光源照射方法,提出对井下煤仓煤位进行检测的基本方法。
5·Introduce the grouting reinforcement method of the soft rock of coal bin and fall area and analyze the fall reasons and the grouting result.
介绍了煤仓软岩及冒落段预注浆加固方法,分析了冒落原因及注浆效果。
6·Chief Engineer with the Coal Bin, as well as companies in the relevant units and departments, such as with the discussion group leader and his party in a meeting.
同煤集团总工程师于斌以及公司有关单位和部门负责人等与课题组一行进行了座谈。
7·The influencing factors of coal arch camber in planomural coal bin and coal drop pipe with rectangular or circular cross section during coal drop are studied theoretically.
对落煤过程中平壁煤仓及截面形状分别为矩形、圆形的落煤管起拱的影响因素进行理论研究。
8·Based on analysis on the law governing coal piling up in coal bin and with queuing theory, a math model has been set up to predict ash content in coal contained in coal bin.
文章在分析仓煤堆积规律的基础上,用队列理论思想建立了一个预测仓煤灰分的数学模型。
9·Under a certain condition the model can be used to predict ash of coal delivered from bin. This is also beneficial to effecting computer management.
该模型在一定条件下能够预测出从煤仓里卸下煤的灰分,而且便于计算机实现。
10·For meeting the reeds of coal production and assuring engineering quality, thd key refuse bin of the flotating refuse system are reformed.
为了适应煤炭生产的需要,对选矸系统进行必要的改造,为了确保工程质量,对关键部件矸石仓进行行之有效的特殊处理。