1·The article analyses the stability subsidence control measures of the reinforced embankment with bridge abutment.
文章分析了桥台与桥头路堤的稳定与沉降控制措施。
2·The model test which is built up according to the subgrade tamping treatment of bridge abutment back is discussed.
针对桥台背路基强夯处理问题开展了模型试验研究。
3·Lateral slide of freeway roadbed and the damage of bridge abutment have been the major engineer hazard of speedway.
高路堤侧向滑动、桥台破坏已成为高速公路主要工程病害。
4·Objective: Stress levels of the surface of alveolar bone around bridge abutment of posterior fixed bridge were studied.
目的:研究下颌后牙固定桥基牙周围牙槽骨表面的应力状态。
5·Bridge abutment traffic jump is always the challenge of all of express highway and is difficult to find a best solution.
桥台跳车现象逢桥必有,是高速公路普遍存在且难以根治的通病之一。
6·AIM: to investigate the repairing effect and clinical significance of using the residual root for fixed bridge abutment tooth.
目的:探讨残根作为固定桥基牙的修复效果和临床意义。
7·It analyzed the cause of jumping in the bridge abutment, and introduced the treatment technology of filling cement of reinforcement.
本文分析了桥头跳车产生的原因,介绍了赣定高速公路桥梁台背注浆加固处理桥头跳车问题的施工技术。
8·Transverse displacement of bridge abutment and fill slide of approach happened during the construction period of Shanghai Huqingping Freeway.
上海沪青平高速公路施工期间,发生桥台横向位移和引道填土滑坡的情况。
9·The retaining-wall foundation is built on the downstream bank slope of the bridge abutment, which stability cannot meet the requirement of specification.
重力式挡土墙建立在桥台的下游护坡上,墙的基础由桩和筏板构成。
10·The article introduces the bridge abutments function and types, and discusses abutment construction and installation measures and the attentions during the usage.
文章简述了桥梁支座的作用、类型,并对支座的施工安装方法、支座使用过程中应注意的事项等进行了探讨。