1·Welding frame of section material, steady structure, with 1000kg static load.
型材焊框架、结构稳固,静载承重达1000 KG。
2·Comparing to make dynamic load model, it is easier to build static load model.
相对于建立负荷动态模型来说,建立负荷的静态模型比较容易。
3·The result approaches static load experimentation, and it can satisfy the requirement.
经静载试验验证,认为检测结果能够满足要求。
4·The study of the behavior of the joints in whole process under static load is conducted.
分析了斜交节点核心区在静力加载全过程中的应变与转角变化特点。
5·The practical comparison shows that this method can reduce cost of static load experiment.
同时通过实例对比说明,这种方法对于静载荷试验具有一定的经济效益。
6·With the increase of initial static load, the dynamic strength of concrete tends to reduce.
随着初始静态荷载的增加,混凝土的动态强度趋于减小。
7·With the abasing of the stratum static load, the bulk of the core sample come into expansion.
钻井岩样由于地层静压力的降低而导致总体积发生膨胀。
8·Bridge static load experiment is main method to identify the safety of bridge board and beam.
桥梁静栽试验是鉴定板(梁)能否安全使用的主要方法。
9·Static load experiment is the most basic and reliable method for ensure single pile bearing force.
静载荷试验是确定单桩承载力方法中最基本、最可靠的方法。
10·The relationship between equivalent static load and temperature field has been verified through tests.
文中还通过试验验证了上述当量静载与温度场的关系。