1·Timetabling is also called the scheduling problem.
排课表问题又称时间表问题。
2·A scheduling problem with rejection has been researched.
研究了工件可拒绝排序问题。
3·The DAG scheduling problem has shown to be NP complete in general.
一般情况下,这种DAG调度是个NP完全问题。
4·The boiler steam system cyclic scheduling problem was investigated.
对锅炉蒸汽系统循环调度问题进行了研究。
5·The performance measure of the scheduling problem is schedule length.
排序问题的性能测度是排序长度。
6·The hypostasis of scheduling problem is the process of conflict resolving.
调度问题的本质是对存在的冲突进行消解的过程。
7·In this research field, it is a none-standard Job Shop Scheduling Problem.
在该研究领域里,它属于非标准型的的作业车间调度问题。
8·It provides a suitable mathematical model for solving the scheduling problem.
它为解决调度问题提供了一个较好的数学模型。
9·Don't ask me what to do about the scheduling problem. He is running the show.
别问我时间表出问题怎么办,他才是结果拍板的人。
10·The single machine scheduling problem with continuous resources is discussed.
讨论具有连续资源的单机排序问题。