1·The experiment equipment of heat-exchange packed tower and its process principle are introduced.
本文介绍了换热塔实验装置及该装置的过程原理。
2·The system makes up of packed tower, vapor maker, water supply system and computer control system.
系统由填料塔装置、蒸汽发生装置、水供给系统以及计算机控制系统等组成。
3·Also it has carried on the elaboration to the metal packed tower fire accident and the prevention.
还对金属填料塔火灾事故及预防进行了论述。
4·In this thesis, the dual-flow tray was combined with packed tower to be a new type compound packed tower.
本文提出了一种新型的复合填料塔设备,将穿流筛板引入到填料塔中。
5·Packed Tower gas scrubbers are low-energy gas scrubbers.? They are used for gas absorption, cooling, and recovery.
填料塔气体洗涤器是一款低能量气体设备。用于气体吸收,冷却和恢复。
6·The stable bio-membrane came into being after inoculating a strain of Thiobacillus thioparus sp in aerobic up-flow packed tower.
在升流式填料塔中,通过接种排硫硫杆菌形成稳定生物膜。
7·Structure and design of tower body, packing, packing support and liquid distributor for a new type of packed tower are described.
介绍了填料洗涤塔的塔体、填料、填料支承装置和液体分布装置的结构和设计。
8·The preparatory test research is carried on the sulfur dioxide gas by using biological-membrane packed tower with desulphurization bacilli.
利用排硫杆菌生物膜填料塔对含二氧化硫烟气的净化效果进行了初步实验。
9·The packed tower process not only used for chemical industry, it is also widely used for purifying low concentration industrial waste gases.
填料塔洗涤吸收净化工艺不单应用在化工领域,在低浓度工业废气净化方面也能很好地发挥作用。
10·Calculation method to determine sprayer point for liquid spray even distribution from row row piping sprayer in a packed tower with wave type packing is introduced.
介绍波纹填料塔内采用排管式喷淋器时液体喷淋点均布的计算方法。