1·Details are presented on jacking schemes, equipment, techniques, construction, key points and the results.
对顶升方案、设备、技术、施工、注意事项及取得的效果等作了较详细的阐述。
2·Maintenance standards for civil aircraft. unit 2: ground safety. part 34: civil aircraft jacking.
民用航空器维修标准。第2单元:地面安全。第34部分:民用航空器的顶升。
3·Combined with the construction sequences of the drift and pile method, the idea of zoning, phasing, grouping, and staging is adopted to design the overall jacking scheme.
结合洞桩法施工工序,按“分区、分阶段、分组、分级”原则,制定总体顶升方案。