1·At the moment the fourth power-generating unit is being built.
此时正在安装第四个发电机组。
2·The LOLP considers the forced outage of a generating unit.
LOLP考虑发电机组的强迫停运。
3·This station has carried out the black startup test on No. 3 generating unit.
该电厂对3号机组进行了黑启动试验。
4·The generating unit is started, using auxiliary power from the start-up source.
发电机组采用来自于起动电源的厂用电来起动。
5·Chief engineer of the turbine control controls everything that deals with the generating unit.
在汽轮机控制总工程师控制一切,随着发电机组的交易。
6·The stability test on real turbine showed that the generating unit has a wide hydraulic vibration area.
真机的部分稳定性试验表明,机组存在较宽的水力振动区;
7·In our country, poor weather conditions are important factor in the design of wind power generating unit.
在我国,恶劣的气候条件是风力发电机组设计考虑的重要因素。
8·Francis turbine's operation out of the optimal mode may induce unstable operation of the generating unit.
混流式水轮机偏离最优工况运行有可能诱发机组的不稳定运行。
9·The first image data generating unit generates first image data based on a first image on the first document.
第一图像数据产生单元基于该第一文档上的第一图像产生第一图像数据。
10·The coordinate control system of generating unit is designed using unidirectional decoupling design technology.
采用了单向解耦设计技术设计了单元机组协调控制系统。