excavation depth

挖掘深度
常用释义
挖掘深度

例句

1·Optimization for excavation depth of foundation trench is carried out and notable economic benefit is achieved.

并且对基槽开挖深度进行优化设计,取得了显著的经济效益。

2·By means of the existing measurement control points on the ground elevation for lofting, determine the excavation depth.

利用已有的丈量控制点对原地面高程进行放样,确定开挖深度。

3·It was indicated that the influence of eccentricity on excavation depth increased with the increase of contact pressure.

挖掘机接触压力越大,偏心距对开挖深度的影响也越大。

4·But with the increase of excavation depth and scale, the displacement and stability problem is becoming a focus in engineering world.

随着基坑开挖深度和规模的增大,其位移和稳定问题日益成为工程界关注的焦点。

5·The anchor tension increases with the excavation depth, and the peak value of the tension tends to move towards the end of the anchor.

随着基坑的开挖,锚杆承受的拉力越来越大且锚杆轴力峰值有向锚杆末端偏移的趋势。

6·Step-slope excavation is suitable for the project of which the foundation has better soil properties, lower excavation depth or enough site space for step-slope.

放坡开挖适用于地基土质较好、开挖深度不深,以及施工现场有足够放坡场所的工程。

7·The powerful Xtrata950 hydraulic excavator and T-130 hydraulic drilling machine with the use of mining of escape, the excavation depth more than 20 meters every day.

功率强大的Xtrata950液压挖掘机和T-130液压钻机配合使用挖掘逃生通道,每天的掘进深度超过20米。

8·It is also lighter than comparable steel or concrete structures, reducing the depth and extent of excavation and foundations.

同可比较的钢材或者混凝土结构,它更加的轻巧,减少了基础开挖的的深度和广度。

9·If the excavation is more than 4 meters in depth, he will assign a Civil Engineer to provide a load calculation, shoring design and oversee the shoring construction during excavation.

如果挖掘深度超过4米,要指派一名土建工程师进行负荷计算、支护设计并在开挖期间监督支护施工。

10·With more and more deep excavation, the depth is also growing.

随着深基坑工程越来越多,深度也越来越大。

同义词

挖掘深度