1·During earth excavation construction, there is an analog approach process to get the volume of earth excavation.
在土方施工中,采用拟合原理求土方体积的方法,有较好的精度。
2·Earth excavation and backfill is to have the appropriate security measures to strictly regulate the construction.
土方开挖与回填是要有相应的安全措施,要严格按规范施工。
3·Anchored retaining wall can reduce the earth excavation quantity and avoid slope collapse in unfavorable geological conditions effectively.
锚杆挡土墙可减少土方开挖工程量,有效避免不良地质情况下的边坡塌方。
4·During earth excavation construction, there is an analog approach process to get the volume of earth excavation. It will be able to get a better result of accuracy.
在土方施工中,采用拟合原理求土方体积的方法,有较好的精度。
5·Light duty operations like the excavation of clays and the loading of sand, earth, and gravel, etc.
一般黏土的挖掘和沙、土砾石和装载等轻作业环境。
6·Our new habitation was an excavation made in the earth.
我们的新住所是一处挖空的地洞。
7·This includes excavation and the placement of earth fill.
土方工程包罗土方的发掘和换填。
8·This paper analyzed the application of earth nail support technique in basis pit excavation in combination of engineering practice.
结合工程实例详细介绍了土钉支护技术在基坑开挖中的应用。
9·The experience of being inside the earth is enhanced through the stone boulders which were discovered during the excavation process and retain the earth.
进入房间,我们将体验到钻入大地的感觉,尤其是当我们看到挖掘出来的巨砾时。
10·This paper, analyzed the calculation of earth pressure on deep excavation.
本文分析了深基坑开挖中的土压力计算问题。