1·Every month we shall establish construction schedule.
每个月我们都要制订建设进度计划。
2·The construction schedule was plagued by the bad weather.
天气恶劣使工程进度受阻。
3·The construction schedule is only a plan, which always has risk.
施工进度计划只是一个计划,总存在风险。
4·The construction schedule and methods of the latter system were put forward.
提出了干挂石材墙面采用现浇聚氨酯保温隔热系统的施工程序及方法。
5·So it looks very important to study the controlment of construction schedule.
因此对施工进度控制问题的探讨就显得尤为重要。
6·Our major planning items contain estimating of cost and construction schedule.
我们主要的计划工作项目包括费用预算和施工进度。
7·The automation would decrease driver's fatigue and speed up construction schedule.
通过自动操纵,减轻了驾驶员的作业强度,加快了施工进度。
8·These meetings should include reviewing and updating the construction schedule and the cost estimates.
这些会议应当包括回顾和更新施工进度和成本预算。
9·In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.
工程施工进度风险分析计算是施工进度控制中的重要环节。
10·Other work must be centered on the construction schedule to adapt to the requirements of the arrangements.
施工中的其他工作必须围绕着并适应施工进度计划的要求安排。