1·Objective business model is a blue print, whereas detailed settlement project is the shop drawing to realize objective business model.
目标业务模型是一张蓝图,而详细解决方案则是实现目标业务模型的详细施工图。
2·The major systems possible to implement in this phase as depart from the Value Stream Mapping Kaizen Blue Print, such as implementation of JIT and TPM.
主要体系的实施正是在这一阶段,比如背离了价值流图的改善蓝图,比如准时化生产和全员生产力维护的实施。
3·We have big program and blue print.
我们有大的规划和蓝图。
4·The initial idea is just a starting point - not a blue print, but a question.
最初的想法只是一个起点-并不是画一幅蓝图,而是问一个问题。
5·It will provide you with a blue print of how you must change and provide you with the vehicle to your final destination.
它将提供给你一个蓝图,关于你必须怎样改变;并提供给你通往你最后终点的方法。
1·At last, it gives the exact design blue print of the model.
最后给出了模型具体的设计方案。
2·According to the problems of the blue print, we put forward the solution and improve the measure.
针对方案实施中遇到的一些问题,提出了解决办法和改进措施。
3·This paper introduced on the request of technology, blue print design, unit select and so on, of the automatic drug adding system of floatation.
本文叙述了浮选自动加药系统的技术要求、方案设计、设备选型等方面的问题。
4·Furthermore, in order to evaluate the validity of "product positioning", this paper exerts the theory of value works in the "evaluation of blue print designing" to reduce the risks of plan.
同时,为了评价“产品定位”的合理性,本文将价值工程原理运用于“方案设计评价”以降低策划风险。
5·Making using of the integrate principle of mechanism, electronics, optics, liquid factors, have designed a suit of feasible control blue print.
综合考虑了机、电、光、液等方面的因素,设计了一套切实可行的控制方案。